Reference Projects

 

Professional Services Inc.  -  Rockledge, Pa.

Status: Ongoing

Contact: Michael Tobin       (215) 663-3605

   Ron Kerr                 (215) 663-3604

The managing partners of CCG have had a mutually rewarding relationship with Professional Services Inc. for many years, even before the inception of CCG.  Through our seamless combined efforts, most customers believe we work as one company.  We have worked at a wide variety of customer’s locations, performing tasks, which include, but are not limited to:

Evaluate existing cable plant and repair necessary areas, including toning, tagging and creating cable records. Also cross-connecting, installing faceplates, placing, testing and troubleshooting phones if necessary.

Installing copper backbone and station cabling. Cat-3, Cat-5, Cat5E & Cat-6

Installing fiber cabling

Paging systems

Installing PBX system cabling

Some customers include Wyeth Labs, Strategic Management, MEDecision, Gemplus, and Trenton Harley Davidson, just to name a few.

 

 

University of the Arts – Philadelphia, Pennsylvania

Status: Complete

Contact: Joseph Garbarino (215) 875-9820

Design: Stephen P Souchuck RCDD

Project Manager: James McKeon

Project Specifics - Installation consisted of a completely new infrastructure including pathways and Category 5E cabling for voice, data and television locations throughout the dorms. In addition, voice and data cabling for the office and classroom areas along with fiber optic and copper feeds were installed to support voice and data from the MC to the IC’s. All cables were terminated on Category 5E patch panels. All cables were tested and documented. This was an Ortronics project that was completed on schedule.

 

 

 

Camden County College – Madison Hall & Madison Connector IT Project

Status: - In Progress

Contact – Al Regenhard (856) 433-0067

Project Manager – Jim Cunha

Project Specifics - Provide and install Siemon System 6 certified solution to support high speed data applications up to and in excess of 100 mbs. 

Scope of Project – Provide and install four pair Category 6 CMP cable to approximately 1,500 locations throughout Madison Hall and Madison Connector Buildings during the construction of these facilities. Install single and multi mode fiber, RG11 coax and multi pair copper feed cable from the Building MC to each of three TR locations. Construct all racks and associated grounding equipment in the building MC and TR closets. Install RG6 coax from the AV MC to approximately thirty five locations. Test all four pair cables, coax cables and fiber and copper feed cables for the appropriate standards compliance. Provide as built drawings upon project completion.

 

 

City Of New Brunswick NJ Water Treatment Facility

Status: - Complete

Contact: - Ed O’Rourke (732) 745-5060

Project Manager – Stephen P Souchuck, RCDD

Project Specifics – Installation of a complete Vicon security camera system which included the installation of underground conduit along with inside conduit to facilitate the installation of the fiber cabling to each camera. This project included the installation of approximately 20 cameras along with DVR’s and ancillary equipment.

 

 

DuPont - Copper and Fiber cabling projects at the Chestnut Run and Experimental Station facility

Status: - Complete

Contact: - Ralph Warren (302) 391-8338

Project Manager: - Chris Adams

Coastal Communications has performed several projects at these facilities. These projects ranged from upgrading their existing outside plant copper backbone, where we installed new sections of cable which involved protecting, splicing and terminating the copper cabling.

We also performed a fiber project where we installed, spliced, terminated and tested both inside, outside and aerial plant cabling.

At the Experimental Station facility we performed a total rewire of a building that included Cat-6e station cabling and upgrading the existing backbone.

 

Federal Aviation Administration (FAA) – Atlantic City Airport

Status: - Complete

Contact: - Carl Petzold (609) 485-6497

Project Manager: - Jim McKeon

Coastal has performed a variety of projects for the FAA over the past several years. Some of these projects include:

  • Campus wide paging – Coastal install paging that tied approximately 40 buildings to a multi zone paging unit. In addition to this paging project we installed horns around the main facilities for emergency evacuation.
  • Outside plant copper and fiber to support the new Coast Guard facility along with the voice and data cabling for the workstations.
  • Outside plant fiber and copper cabling where we install 3600’ of 72-strand fiber, 800’ of 24-strand fiber, and 1200’ of copper cable. This project also included the removal of approximately 700’ of 1200pr copper cable from their existing conduit system.
  • MAC work – Coastal has performed multiple tasks where we move, add or change cabling to accommodate department needs.

 

 

ADDITIONAL PROJECTS

 

Riverside School District – Jodi Lennon – (856) 461-1255

 

Southampton School District – Barbara Godfrey – (609) 859-2256

 

Janney Montgomery Scott – Susan Eastburn – (215) 665-6630

 

Rawle and Henderson – Nancy Mangini – (215) 575-4288

 

South Jersey Technology Partnership – Louis Barrios – (856) 566-4183

 

George School – Michael Hodgin – (215) 579-6515

 

FBI (Federal Bureau of Investigation) – Carmella Bonanno –(215)-418-4415

 

DEC Electric – Joseph Gould – (856)-767-6000

 

Subaru of America – Barry Loglisci – (856) 488-3100